Why this stop matters
BLUE500 view
BLUE500’s symbolic finish, closing the loop at Bowling Sea Lock. Bowling also has substantial serviced moorings and formal long-term options, making it a practical finishing base rather than merely a photo stop.
Vessels on the Clyde must contact Clydeport Estuary Control on VHF 12 before moving in the navigation channel. Bowling Sea Lock uses VHF 16/74, call sign Bowling Basin, with locking normally around two hours either side of high water and advance booking. Lower Basin takes craft to 17m/3.5m beam/1.65m draft and provides showers/toilets, laundry, refuse, Elsan, diesel, water, pump-out and a de-masting crane. Current Kelvin Aqueduct works mean inland navigation remains subject to the live reopening notice, though the sea lock remains operational with possible restrictions.
At a glance
What a cruiser needs to know
Field verification still required
Confirm finish-day Clydeport/sea-lock procedure and tide, visitor berth allocation, Kelvin Aqueduct reopening status, temporary unattended post-route layover, security, shore power, boat checks/keyholding and current mast-crane/launch options. Identify a BLUE500 completion/photo point without obstructing lock operations.
Primary source
Check current official information
BLUE500 organises the route, but operational and navigation-critical information must remain current.
Official website ↗
